OSILTEC ENERGY TERMS AND CONDITIONS
1. Introduction
Welcome to Osiltec Energy.
These Terms and Conditions of Use (“Terms”) govern access to and use of www.osiltecenergy.com; Osiltec Energy websites; customer portals; online tools; calculators; cost-estimation tools; energy-assessment tools; software; applications; reports; digital services; enquiry forms; project-assessment services; and other online or technology-enabled services made available by Osiltec Energy.
By accessing or using the website or submitting information through our digital services, you agree to these Terms.
If you do not agree, you should not use the applicable services.
2. Website Operator
The website is operated under the Osiltec Energy brand by:
[INSERT FINAL LEGAL ENTITY – expected to be Osiltec Consulting Pvt Ltd unless another entity is designated]
Address: P No 57/99, Unit No 501, 5th Floor, Veekay Prime, Patrika Nagar, Serilingampally, Madhapur, Hyderabad, Telangana-500081.
Email: legal@osiltec.com
In these Terms, “Osiltec Energy”, “Osiltec”, “we”, “our” and “us” refer to the website operator and, where relevant, the Osiltec entity identified in a project-specific agreement.
3. Nature of Osiltec Energy
Osiltec Energy is being developed as a technology-first integrated energy solutions company.
Depending upon the relevant service or project, Osiltec Energy may act as energy-technology provider; assessment platform; software provider; energy consultant; project-development company; equipment supplier; procurement coordinator; EPC contractor; EPC management company; engineering coordinator; renewable-energy developer; RESCO/PPA developer; group-captive project developer; EV infrastructure provider; battery-solutions provider; technology integrator; project manager; contractor coordinator; service-provider marketplace or introducer; or commercial intermediary.
The exact role of Osiltec Energy for any particular commercial project will be defined in the applicable quotation, proposal, purchase order, work order, EPC agreement, PPA, development agreement or other written contract.
4. Services
Services may include solar energy services such as rooftop solar, ground-mounted solar, captive solar, solar EPC, solar project development, solar procurement and O&M; renewable-energy services such as renewable open access, group captive, captive power, third-party PPAs, renewable procurement, wind and hybrid renewable projects; battery-energy-storage assessments, project sizing, equipment sourcing, integration and EPC coordination; EV-charging feasibility, electrical analysis, charger selection, supply, installation coordination and charging infrastructure; EV battery solutions including aftermarket batteries, replacement batteries, vehicle-specific battery evaluation, manufacturing-partner coordination and fleet battery solutions; green-hydrogen and future-energy feasibility, technology evaluation and project partnerships; and technology services including energy analytics, automated assessments, cost estimation, savings estimation, energy software, dashboards, data analysis and artificial-intelligence-assisted analysis.
5. Technology-Based Energy Assessments
Osiltec Energy may allow users to provide information including electricity bills and site data to obtain an indicative energy assessment.
Our technology may automatically analyse information and provide estimates concerning current energy cost; recommended solar capacity; potential renewable-energy percentage; expected solar generation; potential energy savings; investment requirement; indicative payback; battery capacity; EV charging requirement; carbon reduction; open-access opportunity; project economics; or other metrics.
Such assessments are intended to assist with preliminary decision-making.
6. Preliminary Estimates Are Not Binding Quotations
Unless expressly identified as a binding commercial offer issued by an authorised Osiltec Energy representative, any automated estimate; calculator result; indicative quotation; online assessment; preliminary report; estimated saving; estimated generation; estimated project cost; payback calculation; or preliminary recommendation is indicative only.
It does not constitute a binding EPC quotation; guaranteed project price; guaranteed energy saving; guaranteed electricity tariff; engineering certification; project-performance guarantee; guaranteed financing offer; utility approval; regulatory approval; or commitment to execute a project.
7. Why Estimates Can Change
Actual project results can differ because of site conditions; roof condition; structure; shading; irradiation; weather; equipment availability; module degradation; load changes; operating hours; customer consumption; utility tariff changes; taxes; duties; grid losses; wheeling charges; banking charges; open-access charges; cross-subsidy surcharge; additional surcharge; financing costs; interest rates; equipment pricing; foreign-exchange rates; logistics costs; land costs; regulatory changes; interconnection requirements; utility approvals; grid availability; equipment performance; downtime; force-majeure events; and other project-specific factors.
A final project proposal may therefore differ materially from an initial online assessment.
8. No Guarantee of Savings
Any statement concerning potential savings is an estimate unless expressly guaranteed in a separately signed contract.
Actual savings may depend upon customer electricity usage; electricity tariffs; equipment performance; renewable-energy generation; regulatory charges; demand profile; power factor; operating schedule; and other variables outside Osiltec Energy’s control.
9. User Responsibility for Information
The reliability of an energy assessment depends substantially upon the information supplied.
You agree that information submitted by you will, to the best of your knowledge, be accurate; complete; current; lawfully obtained; and provided with appropriate authority.
Osiltec Energy is not responsible for inaccurate outputs caused by inaccurate, incomplete, outdated or misleading information supplied by a user.
10. Authority to Provide Electricity Bills and Documents
By uploading electricity bills; site documents; property documents; technical drawings; vehicle information; photographs; financial information; or other material, you represent that you have authority to provide such information for the requested purpose.
11. Site Survey Required for Final Engineering
Online analysis cannot replace an appropriate physical or detailed technical assessment where one is necessary.
Before final engineering or construction, Osiltec Energy or its authorised contractor may require a site survey; structural inspection; electrical inspection; shading study; soil investigation; land verification; transformer assessment; utility review; metering review; safety assessment; engineering study; or other technical investigation.
12. Third-Party EPC Contractors
Osiltec Energy may execute certain projects using third-party EPC contractors or specialist subcontractors.
These may include civil contractors; electrical contractors; solar installers; structural contractors; BESS integrators; EV charger installers; engineering consultants; testing agencies; commissioning contractors; logistics companies; and O&M service providers.
The contractual responsibility for their work will depend upon the project-specific agreement.
13. Osiltec as Prime Contractor
Where a signed agreement expressly appoints Osiltec Energy or an Osiltec entity as the EPC or prime contractor, responsibilities will be governed by that agreement.
The agreement may address project scope; price; schedule; subcontractors; technical specifications; performance; warranties; liquidated damages; insurance; payment; acceptance; and liability.
14. Osiltec as Adviser or Introducer
In other circumstances, Osiltec Energy may only introduce, recommend or coordinate an independent service provider.
Unless expressly stated otherwise in writing, such independent provider is not an employee, agent or legal representative of Osiltec Energy.
Where the user contracts directly with an independent provider, the contract between the user and that provider will govern the provider’s work.
15. Project-Specific Contracts Take Precedence
These website Terms primarily govern use of Osiltec Energy’s website and digital services.
If you subsequently enter into a signed EPC agreement; supply contract; purchase order; PPA; RESCO agreement; O&M contract; development agreement; financing document; or other project-specific agreement, that agreement will prevail over these Terms to the extent of any inconsistency concerning the relevant project.
16. Quotations and Proposals
Commercial quotations are subject to stated validity; scope; exclusions; assumptions; taxes; payment conditions; technical specifications; and other quotation terms.
Submission of a quotation does not automatically create a contract.
A binding commercial arrangement arises only through the applicable legally effective acceptance mechanism, such as a signed agreement, accepted purchase order or other written confirmation.
17. Equipment Availability
Equipment recommendations are subject to availability.
Osiltec Energy may recommend technically appropriate alternative products where equipment becomes unavailable; manufacturer specifications change; product certification changes; supply chains change; or project requirements change, subject to any approval rights specified in the project contract.
18. Manufacturer Warranties
Equipment may be subject to warranties issued by manufacturers.
Where applicable, Osiltec Energy may facilitate warranty claims but does not automatically extend or replace a manufacturer’s warranty unless expressly stated in the applicable contract.
19. Solar Generation Estimates
Generation estimates may be based upon historical irradiation data, simulation models, equipment assumptions and system configuration.
Actual generation may differ due to weather; soiling; shading; module degradation; equipment downtime; grid outages; curtailment; maintenance; environmental conditions; and operating restrictions.
20. Open Access, Captive and Group-Captive Projects
Open-access and captive-energy projects involve regulatory requirements that may change.
Project feasibility may depend upon applicable regulations; captive-ownership requirements; consumption requirements; utility approvals; grid connectivity; banking; scheduling; wheeling; transmission charges; cross-subsidy surcharges; additional surcharges; state regulations; and other governmental or regulatory requirements.
An online estimate cannot guarantee regulatory approval.
21. Grid Connectivity
Identification of land near a substation does not guarantee available evacuation or grid connectivity.
Connectivity remains subject to capacity; technical studies; utility procedures; regulatory requirements; network upgrades; approvals; and applicable charges.
22. Subsidies and Government Incentives
Information concerning subsidies, incentives, tax benefits or government programmes is informational unless expressly confirmed in writing.
Programmes can change, expire, become oversubscribed or have eligibility requirements.
Osiltec Energy does not guarantee that a customer will receive any subsidy or incentive.
23. Financing
Where Osiltec Energy introduces or assists with loans; project finance; leases; PPAs; RESCO structures; investor funding; or other financing, approval remains at the discretion of the relevant financial institution or investor.
Nothing on the website constitutes a guaranteed offer of finance.
24. Battery Energy Storage
Battery storage recommendations depend upon assumptions concerning cycling; depth of discharge; temperature; load profile; tariff; battery degradation; warranty; cell chemistry; power requirements; and operating strategy.
Battery performance and life can vary according to actual operating conditions.
25. EV Charging
EV-charging assessments may depend upon electrical capacity; transformer capacity; charger utilisation; vehicle compatibility; parking configuration; connection approvals; power availability; and applicable regulations.
Projected charger utilisation or revenue is not guaranteed.
26. EV Battery Solutions
EV replacement and aftermarket battery solutions require vehicle-specific technical evaluation.
Compatibility may depend upon voltage; capacity; chemistry; BMS; communication protocols; connectors; thermal management; physical dimensions; charging system; and vehicle software.
No battery should be considered compatible solely because voltage or capacity appears similar.
A battery product should only be used where compatibility has been appropriately established.
27. Manufacturing Partners
Certain EV batteries or other products may be manufactured by specialist third-party manufacturing partners.
The identity of the manufacturer, warranty provider and responsible contracting party may be set out in product documentation; invoice; warranty card; quotation; or contract.
Osiltec Energy will not represent that a product is manufactured at an Osiltec-owned plant unless this is factually the case.
28. Green Hydrogen and Emerging Technologies
Hydrogen, green ammonia, green methanol and other emerging-energy technologies involve evolving technologies; regulations; economics; infrastructure; standards; and markets.
Website information relating to such technologies is intended primarily for project exploration and does not constitute a guarantee of technical or commercial feasibility.
29. Professional Advice Disclaimer
General website content and automated assessments do not constitute legal advice; tax advice; investment advice; regulated financial advice; structural certification; statutory engineering certification; or regulatory approval.
Appropriate professionals should be consulted where necessary.
30. Software and Platform Availability
We aim to make our digital services available reliably but cannot guarantee uninterrupted operation.
Services may be unavailable because of maintenance; updates; telecommunications problems; cyber incidents; hosting failures; third-party outages; force majeure; or technical errors.
31. Beta and Experimental Features
Certain software, calculators, AI functions or digital services may be labelled beta; pilot; experimental; preview; or evaluation.
Such services may contain errors; change without notice; produce incomplete outputs; or be discontinued.
Users should independently verify material commercial decisions before relying on experimental outputs.
32. User Accounts
Where customer accounts are introduced, users are responsible for maintaining accurate account information; keeping credentials confidential; preventing unauthorised account access; and promptly notifying Osiltec Energy of suspected misuse.
33. Acceptable Use
Users must not attempt unauthorised access; disrupt website operation; introduce malicious software; scrape the platform at unreasonable scale; reverse engineer proprietary technology except where legally permitted; circumvent security; upload unlawful content; impersonate another person; submit fraudulent information; infringe intellectual property; use the platform for unlawful purposes; or misuse energy assessments or reports.
34. Intellectual Property
Unless otherwise stated, Osiltec Energy or its licensors own rights in website content; branding; Osiltec Energy marks; software; calculators; algorithms; assessment methodologies; databases; reports; design elements; graphics; and proprietary documentation.
No ownership is transferred merely because a user accesses the website.
35. Customer Data
Users retain ownership of their underlying information and documents, subject to third-party rights.
By submitting information, users grant Osiltec Energy the limited rights reasonably required to process the information; perform the requested assessment; prepare proposals; provide services; develop projects; and engage relevant providers as described in our Privacy Policy.
36. Assessment Reports
Unless otherwise agreed, preliminary assessment reports are supplied for the recipient’s internal evaluation.
Users should not remove proprietary notices; falsely represent the analysis as independently certified; resell proprietary Osiltec analysis; or use confidential methodologies to create competing software.
37. Confidentiality
Osiltec Energy will use reasonable measures to protect commercially sensitive information.
However, general website submissions are not automatically subject to a separate NDA.
Users requiring enhanced contractual confidentiality should request an NDA before submitting highly sensitive proprietary information.
38. De-Identified and Aggregated Data
Osiltec Energy may use aggregated or de-identified information for benchmarking; analytics; research; model improvement; market intelligence; product development; and internal business planning, provided such information is structured so that it is not intended to identify an individual.
39. Privacy
Use of personal information is governed by the Osiltec Energy Privacy Policy available on the website.
By using relevant services, you acknowledge that information will be processed as described in that policy.
40. Third-Party Links and Services
Our website may contain links or integrations involving third parties.
Osiltec Energy is not responsible for unrelated third-party websites; services; content; privacy practices; or security.
Use of such services may be subject to separate terms.
41. Payments
Where online payments are enabled, the applicable service page, quotation or order will identify price; taxes; payment terms; refund conditions; and applicable fees.
Submitting an online payment does not expand Osiltec Energy’s scope of service beyond what is expressly described in the applicable service or order.
42. Taxes
Unless stated otherwise, prices may be subject to GST; duties; statutory levies; and other applicable taxes.
Project-specific tax treatment will be identified in the relevant quotation or contract.
43. Cancellation and Refunds
Cancellation and refund rights for paid assessments; equipment; surveys; design work; engineering; procurement; or project services will be governed by the applicable quotation, order or contract.
Nothing in these Terms excludes mandatory rights that cannot lawfully be excluded.
44. No Implied Project Commitment
Submitting an enquiry does not require the user to purchase a project or Osiltec Energy to accept or execute the project.
Osiltec Energy may decline projects based upon technical feasibility; geography; credit risk; project size; resource availability; safety; regulation; or commercial considerations.
45. Service-Provider Selection
Where Osiltec Energy uses contractors, we may consider experience; qualifications; pricing; geography; availability; safety record; capacity; and technical suitability.
Selection of a provider does not constitute a guarantee that unforeseen errors or delays cannot occur.
46. Health and Safety
Physical energy projects involve electrical, construction, battery and industrial risks.
Users should not perform installations or modify equipment based solely upon online website information.
Installation, commissioning, maintenance and repair should be undertaken by appropriately competent persons.
47. Limitation of Website Liability
To the maximum extent permitted by applicable law, Osiltec Energy will not be liable for indirect, incidental, special, punitive or consequential loss arising solely from use of free website content or preliminary digital tools, including loss arising from reliance on an unverified preliminary estimate.
For paid digital services where no separate contract applies, Osiltec Energy’s aggregate liability relating specifically to that digital service will, to the maximum extent permitted by law, be limited to the greater of the amount paid to Osiltec Energy for that digital service during the preceding twelve months or INR 10,000, except where applicable law does not permit such limitation.
48. Project Liabilities
The limitation above is intended principally for website and preliminary digital services.
Liability relating to an actual EPC project; equipment supply; construction project; PPA; battery product; O&M contract; or other project-specific engagement will be governed by the applicable signed contract, warranty and mandatory law.
49. Non-Excludable Rights
Nothing in these Terms excludes or limits liability that cannot legally be excluded; rights under mandatory applicable law; or applicable statutory consumer rights.
50. User Indemnity
To the extent permitted by law, a user agrees to be responsible for loss reasonably resulting from the user’s unlawful use of the platform; fraudulent submission; infringement of third-party rights; unauthorised disclosure of third-party information; or intentional misuse of Osiltec systems.
This clause does not require an individual consumer to waive rights that cannot legally be waived.
51. Force Majeure
Osiltec Energy will not be responsible for delay or failure caused by circumstances beyond reasonable control, which may include natural disasters; flood; cyclone; earthquake; fire; epidemic; pandemic; war; terrorism; civil unrest; government action; regulatory change; grid failure; utility shutdown; supply-chain disruption; transportation disruption; labour disruption; major cyber incident; telecommunications failure; equipment shortage; or similar events.
Project-specific force-majeure provisions may be contained in the relevant contract.
52. Suspension
We may restrict or suspend access to digital services where reasonably necessary for security; maintenance; suspected fraud; unlawful activity; violation of these Terms; or protection of other users or systems.
53. Termination
Users may stop using the website at any time.
Termination of website use does not automatically terminate outstanding orders; signed contracts; payment obligations; warranty arrangements; or other project-specific agreements.
54. Changes to Services
Osiltec Energy may add, modify or discontinue software functions; calculators; service categories; geographic coverage; technologies; and website features.
Material existing contractual obligations will remain subject to applicable project agreements.
55. Changes to These Terms
We may amend these Terms as our technology, regulatory environment and services evolve.
The current version will be displayed on the website with the latest revision date.
For material changes affecting existing paid digital services, additional notice may be provided where appropriate.
56. Communications
Users agree that we may communicate in connection with requests or transactions through email; telephone; SMS; WhatsApp or equivalent business messaging; portal notification; or another contact method supplied by the user.
Promotional communications can be opted out of separately.
57. Electronic Communications
Electronic communications, online acceptance, digital records and electronic documents may be used in business transactions to the extent permitted by applicable law.
A project-specific agreement may prescribe additional signature or execution requirements.
58. Governing Law
These Terms are governed by the laws of India.
59. Commercial Dispute Resolution
For disputes involving a commercial or business user arising specifically from these website Terms and not governed by another signed agreement, the parties should first attempt good-faith resolution.
If the dispute remains unresolved, it may be referred to arbitration in accordance with the Arbitration and Conciliation Act, 1996, as amended.
Unless otherwise agreed, the tribunal will consist of one arbitrator mutually appointed; the seat and venue of arbitration will be Hyderabad, Telangana; and proceedings will be conducted in English.
Where another signed project agreement contains a dispute-resolution mechanism, that agreement will govern the relevant project dispute.
60. Individual Consumers
Nothing in the arbitration or jurisdiction provisions is intended to remove rights or remedies available to an individual consumer under mandatory applicable law.
Where a statutory consumer forum or other competent authority has jurisdiction that cannot lawfully be excluded, these Terms will be interpreted accordingly.
61. Jurisdiction
Subject to any applicable arbitration agreement; mandatory consumer rights; and another project-specific contract, courts having competent jurisdiction in Hyderabad, Telangana, India shall have jurisdiction over disputes concerning these Terms.
62. Severability
If a provision of these Terms is held unlawful or unenforceable, the remaining provisions will continue to operate to the extent legally possible.
63. No Waiver
Failure by Osiltec Energy to immediately enforce a provision does not constitute a permanent waiver of that provision.
64. Entire Website Agreement
These Terms together with the Privacy Policy and any service-specific terms constitute the agreement governing general use of Osiltec Energy’s website and digital services.
They do not replace a subsequently executed project-specific contract.
65. Contact
Questions concerning these Terms may be addressed to:
Legal Team
Osiltec Energy
Email: legal@osiltec.com
Address: P No 57/99, Unit No 501, 5th Floor, Veekay Prime, Patrika Nagar, Serilingampally, Madhapur, Hyderabad, Telangana-500081.
General enquiries: sales.energy@osiltec.com
Privacy: legal@osiltec.com
Website: www.osiltecenergy.com
